Speak for us the many activities carried out on behalf of some of the below companies and of which we cite the most important:
ROTA GUIDO Srl

     Supply relationship maintained since 1997 exclusively with 3 teams working on throughout the country for which our staff have made over the years thousands of square meters of structures livestock and agricultural centers medium to large (from 1000 square meters. In 9000 sqm.)

METAL GROUP Edimo S.p.A.

     Implementation of the package of coverage and the underlying structural ceiling in the shopping center at the U.S. Navy Support Site Gricignano di Aversa, extension mq.10.000.
     Expansion of industrial building Sitindustrie International SpA Sulmona structure and cover for mq.6000.
     Expansion of industrial building at Fiat Melfi Induced company OSL SpA, mounting structure and cover for mq.8000;
     Laying the cover plates on all the structures belonging to the complex Foiano Outlet Village in Val di Chiana (AR).
     Implementation of the package of coverage of Lot 3 of the Milan Malpensa Airport Terminal 1.
     Construction of the "Tulip" Lot 3 Milan Malpensa Airport Terminal 1.
     Barrier breaker breath at "motorway A5 - Mont Blanc tunnel" in Courmayeur (AO).

METAL GROUP Edimo S.p.A.

     Implementation of the package of coverage and the underlying structural ceiling in the shopping center at the U.S. Navy Support Site Gricignano di Aversa, extension mq.10.000.
     Expansion of industrial building Sitindustrie International SpA Sulmona structure and cover for mq.6000.
     Expansion of industrial building at Fiat Melfi Induced company OSL SpA, mounting structure and cover for mq.8000;
     Laying the cover plates on all the structures belonging to the complex Foiano Outlet Village in Val di Chiana (AR).
     Implementation of the package of coverage of Lot 3 of the Milan Malpensa Airport Terminal 1.
     Construction of the "Tulip" Lot 3 Milan Malpensa Airport Terminal 1.
     Barrier breaker breath at "motorway A5 - Mont Blanc tunnel" in Courmayeur (AO).

MICHELANGELO LOMBARDI S.r.l. year 2003

     Mounting the roof welded to 400 tonnes, Maritime Museum of Cesenatico with its cover for mq.1000

ISPA S.r.l. year 2004

     Mounting frame and cover 4000 square meters Covered Market Piazza Cavour La Spezia;
     Mounting frame and cover for mq.1000 shed load freight customers and deposits IKEA Naples.

For SMI ITALY Srl - CIMOLAI S.p.A. year 2006

     Implementation of the package of coverage of the MUNICIPAL STADIUM OF TURIN to 16,000 square meters, consists of corrugated metal, insulated panels and translucent polycarbonate.

TUBOSIDER S.p.A. year 2007

     Installation of barriers antifoniche metal structure, concrete panels and polycarbonate mq.20.000 at the Naples motorway SpA

For GENERAL CONSTRUCTION S.p.A. - Ansaldo Energia year 2007

     Construction of 2 chimneys diameter of 6 m and a height of each mt.50; The contract included the construction of the logs chimney through the assembly and welding of the ferrules in place, all performed with the procedure Mig-May 136, the lifting-altitude of the logs made and welded in place. All welds were subjected to non-destructive testing such as radiography, dye penetrant, ultrasonic, and others, audited and supervised by an Inspector of the Italian Institute of Welding. Contract carried out in conjunction with another company at 2x400 mw gas turbine power plant RIZZICONI ENERGY Rizziconi (RC ago some photos). Nellesi of processes:
     Construction of 3 tanks of 500, 1000 and 2500 mc. different diameter and height respectively drinking water, demineralized water and raw water and fire, The contract included the construction of the bottom of the shell and the roof and the subsequent welding process operates Mig-Mag. 136. All welds were subjected to non-destructive testing such as radiography, dye penetrant, ultrasonic and others, with subsequent verification and supervision of an inspector of the Italian Institute of Welding. Contract carried out in conjunction with another company at the realizzanda combined cycle gas turbine power plant 2x400 MW RIZZICONI ENERGY Rizziconi (RC)

For GENERAL CONSTRUCTION S.p.A. - Ansaldo Energia years 2008 - 2010

     Construction of one chimney diameter ranging from mt. 6.40 to mt.8, 00 for a height of mt.71; The contract includes the construction of the logs chimney through the assembly of the ferrules to the ground and the lifting portion of the logs made, completely welded in place and in part flanged . All welds were subjected to non-destructive testing such as radiography, dye penetrant, ultrasonic and more at realizzanda combined cycle gas turbine power plant 1x400 mw TIRRENO POWER Napoli Levante (NA)
     Construction of 2 tanks of 1500 and 3000 mc. different diameter and height respectively demineralized water and raw water and fire, The contract included the construction of the bottom of the shell and the roof and the subsequent welding on site. All welds were subjected to non-destructive testing such as radiography, dye penetrant, ultrasonic and more at realizzanda 1x400 MW Gas Turbine Power Plant in East Naples (NA)
     Installation of wall panels to buildings, gas turbine, and mesa filter:

ORTOLAN S.p.A. year 2009

     Installation of barriers antifoniche in metal and aluminum panels for soundproofing mq.12.000 about. Project in progress on the Bologna ring road. Shipyard running at night to traffic requirements:

For GENERAL CONSTRUCTION S.p.A. year 2010

     Mounting the carpentry of "SAIL" perimeter to the boiler and the chimney of the gas turbine power plant 1x400 mw TIRRENO POWER Napoli Levante (NA)
     Installation of steel structures including buildings former silos Napoli Levante

For EDF in Italy S.p.A. year 2010

     Installation of two photovoltaic plants at Nestle of Benevento and Ferentino (FR) including installation of metal structures and panels including electrical connection strings.

For M.Z. Costruzioni Srl year 2010

     Installation of steel structures and silos in the Ivory Coast including a building for the storage of flour in the service of a factory. lastly

For GENERAL CONSTRUCTION S.p.A. - Ansaldo Energia year 2011

     Construction of one chimney with a diameter of 6 m and a height of 58 m, The contract included the construction of the logs by the fireplace assembly and welding of the ferrules in place, all performed with the procedure Mig-May 136, the lifting portion of the logs manufactured and welded in place. All welds were subjected to non-destructive testing such as radiography, dye penetrant, ultrasonic, and others, audited and supervised by an Inspector of the Italian Institute of Welding. Contract carried out in conjunction with another company at 2x400 mw gas turbine power plant SORGENIA Aprilia (LT).

For GENERAL CONSTRUCTION S.p.A. - Ansaldo Energia year 2011

     Construction of a duct air-cooled condenser of decreasing diameter from 7 mt. mt.2.5 to the length of mt.120 including nr.7 vertical risers of the total weight of 800 tons .. Activities carried out from March to September 2011. The construction process was performed by using the assembly and welding of the ferrules in place, all performed with the procedure Mig-May 136, lifting and laying of the logs made. All welds were subjected to non-destructive testing such as radiography, dye penetrant, ultrasonic, and others, audited and supervised by an inspector of the Italian Institute of Welding. Contract carried out in conjunction with another company at 2x400 mw gas turbine power plant SORGENIA Aprilia (LT).